← All projects
Building · 2024
Civic Center Long-Span Roof
A 60 m tied-arch roof over a community sports hall, creating a column-free interior.
- Type
- Building
- Year
- 2024
- Location
- Northgate, ST
- My role
- Design engineer
- Structural system
- Steel tied arches at 8 m centers
- Size
- 60 m span
- Materials
- Steel
- Status
- Completed
Overview
Placeholder text. A new multi-use hall needing an open floor for courts and events.
The challenge
Snow drift against the neighboring building and unbalanced loading governed the arch design.
Approach
- Form-found the arch profile to minimize bending under the governing load combinations
- Used a steel tie to keep thrust off the foundations
- Checked the arch’s in-plane and out-of-plane buckling with nonlinear analysis
Outcome
A 60 m column-free interior with exposed arches as the main architectural feature.
Photos
Gallery
01Arch segments staged before erection
02Column-free hall interior
03Nonlinear buckling analysis model