Harbor Street Mass Timber Office
Six-storey office building with a CLT floor system on glulam post-and-beam framing over a concrete podium.
- Type
- Building
- Year
- 2025
- Location
- Harbor District, ST
- My role
- Project engineer
- Structural system
- CLT panels on glulam frame, concrete cores
- Size
- 6 storeys · 8,400 m²
- Materials
- Timber, Concrete
- Status
- In construction
Overview
Placeholder text. A speculative office building where the owner wanted exposed timber throughout for its warmth and lower embodied carbon.
The challenge
Timber floors are light, which makes footfall vibration and acoustic separation the governing design issues, not strength.
Approach
- Optimized a 9 m × 6 m grid to balance panel spans against beam depth
- Ran vibration analysis to set CLT thickness and topping
- Coordinated concealed steel connections with the fire engineer to meet the required rating
Outcome
The structure came in at roughly 40% lower embodied carbon than the concrete baseline scheme.
Photos
Gallery
01CLT floor panels going in on level 4
02Concealed steel knife-plate connection
03Exposed glulam frame in the finished office