← All projects

Building · 2025

Harbor Street Mass Timber Office

Six-storey office building with a CLT floor system on glulam post-and-beam framing over a concrete podium.

Type
Building
Year
2025
Location
Harbor District, ST
My role
Project engineer
Structural system
CLT panels on glulam frame, concrete cores
Size
6 storeys · 8,400 m²
Materials
Timber, Concrete
Status
In construction

Overview

Placeholder text. A speculative office building where the owner wanted exposed timber throughout for its warmth and lower embodied carbon.

The challenge

Timber floors are light, which makes footfall vibration and acoustic separation the governing design issues, not strength.

Approach

  • Optimized a 9 m × 6 m grid to balance panel spans against beam depth
  • Ran vibration analysis to set CLT thickness and topping
  • Coordinated concealed steel connections with the fire engineer to meet the required rating

Outcome

The structure came in at roughly 40% lower embodied carbon than the concrete baseline scheme.

Photos

Gallery